top of page

Distributor for picture framers

buttoneng2.png
buttoneng1.png

Frame Factory

News

04.2018 | A new look for our warehouse

What if we took the time to take a look at the history of our warehouse and at the works of the past year?

​

During the summer of 2004, we moved to our new warehouse in the Edward Vlietinckstraat in Ostend. A 14-year old building on a 7,500 m² terrain. In the time, the 2,000 m² of stocking space represented the double of our stock and we thought we'd have enough space for several generations...

​

However, thanks to your confidence in our company and thanks to the commitment of our team, Cami didn't stop growing. Furthermore, EC Mouldings, our sister-company since 2008, started to have a lack of space in 2017, a real first-world problem...

​

Therefore, we added 400 m² of extra stocking space last year, as well as 5 hangars to rent (270 m² each). We made use of these works to give our main building a new look: new facade, extra acces, brand new parking, etc.

​

We are pleased to show you the result on the pictures below.

bottom of page